Skip to main content
GeoProGlobal Geodesy · Surveying
Coverage

Geodesy and land management in Aktobe

Aktobe Region sits on the route crews take from Aktau into the interior, so projects here are combined with work in neighbouring regions. The main lines are mining and processing sites, linear objects and land management for subsoil use.

Region
Aktobe Region
Base
Aktau, mobile crew
Reporting
RU / KZ / EN
Who orders here

The economy of Aktobe Region

Chrome ore mining and processing, ferroalloy production, the Zhanazhol and Kenkiyak oil and gas fields, a major rail hub and the Western Europe to Western China transit corridor.

Rocky and semi-rocky ground in the north of the region and clay sequences in the south call for different drilling programmes, so the survey programme is drawn up per site. Geodetic work runs year-round; winter conditions affect the productivity of drilling, earthworks and some field tests, so those stages are scheduled with a margin.

Objects

What we survey in Aktobe Region

01

Mining and processing sites

Topographic and as-built surveys of plant areas, plus stockpile surveys and volume calculation.

02

Pipelines and access roads

Route surveys, profiles, right-of-way and as-built documentation for linear objects.

03

Land management for subsoil use

Allocation of plots for subsoil use contracts and changes to designated land purpose.

04

Rail infrastructure

Surveys of track layouts, setting-out and as-built surveys during track reconstruction.

How the crew gets there

By road from Aktau along the Beyneu to Aktobe corridor: the drive with equipment takes about 1.5–2 days. That allows sites in Aktobe, Atyrau and West Kazakhstan regions to be combined into one trip. Regular flights are also available.

Legal standing

Contracts for work in Aktobe Region are signed with GeoProGlobal LLP, BIN 130440018479. GeoProGlobal LLP carries out geodetic works in accordance with the legislation of the Republic of Kazakhstan. The territory of activity is not limited to the company’s region of registration. Works are performed in compliance with statutory requirements for geodetic activity, specialists, measuring equipment and the notification procedure. The company is listed in the public procurement supplier registry.

All legal grounds
FAQ

Ordering surveys in Aktobe

Can sites in several western regions be combined into one contract?

Yes, and it is cheaper for the client: one crew trip covers sites in Mangystau, Atyrau, Aktobe and West Kazakhstan regions, and the mobilisation cost is shared between sites instead of being paid for each one.

How are stockpile volumes calculated?

The survey is flown with a DJI Matrice 4E, a dense surface model is built from the imagery, and volume is computed between the model and a defined base plane. The method is repeatable and allows volumes to be compared between cycles.

How long does a land management project for subsoil use take?

The field part takes from a few days to a couple of weeks depending on area, while the overall duration is driven by the land commission and registration, typically 14 to 45 days.

Need a project estimate?

Send the brief or call us and we will return a preliminary site estimate within 24 hours.

CallWhatsAppEstimate