Skip to main content
GeoProGlobal Geodesy · Surveying
Coverage

Geodesy and land management in Atyrau

Atyrau Region is the oil and gas region closest to our base: crews drive there along the Aktau to Beyneu to Atyrau highway without transferring equipment. Demand centres on linear objects, field sites and reclamation of disturbed land.

Region
Atyrau Region
Base
Aktau, mobile crew
Reporting
RU / KZ / EN
Who orders here

The economy of Atyrau Region

The country largest fields (Tengiz, Kashagan), oil refining, oilfield services and modular fabrication, plus Caspian port and pipeline infrastructure.

The Caspian lowland, salt flats, a high water table and seasonal flooding: vertical control is fixed with a margin and the field stage is scheduled outside the flood period. Regional reclamation specifics come from oil-contaminated land and natural conditions; Order No. 289 of the Ministry of Agriculture applies nationwide.

Objects

What we survey in Atyrau Region

01

Linear objects

Route surveys for pipelines, power lines and access roads, longitudinal profiles and right-of-way strips.

02

Well pads

Setting-out and as-built surveys of drilling pads, plus earthwork volume calculation.

03

Reclamation of oil-contaminated land

Reclamation projects for sludge pits and oil-stained plots, with surveys before and after the technical stage.

04

Geodynamic and deformation monitoring

Cyclic high-precision levelling, static GNSS observations and gravimetric measurements to control settlement, displacement and deformation of fields, industrial sites, tanks and structures.

How the crew gets there

By road from Aktau along the Beyneu to Atyrau highway: the crew, total stations, GNSS receivers, drone and the PBU-2 drilling rig on a SHACMAN 6×6 chassis travel in a single trip. The drive with equipment takes about 12–15 hours (one daylight day). Regular flights are available for urgent tasks.

Legal standing

Contracts for work in Atyrau Region are signed with GeoProGlobal LLP, BIN 130440018479. GeoProGlobal LLP carries out geodetic works in accordance with the legislation of the Republic of Kazakhstan. The territory of activity is not limited to the company’s region of registration. Works are performed in compliance with statutory requirements for geodetic activity, specialists, measuring equipment and the notification procedure. The company is listed in the public procurement supplier registry.

All legal grounds
FAQ

Ordering surveys in Atyrau

How long does it take a crew to travel from Aktau to Atyrau Region?

Atyrau Region borders Mangystau: the crew travels by road in a single trip with the equipment and the PBU-2 drilling rig on a SHACMAN 6×6 chassis. The drive takes about 12–15 hours. That is cheaper than air freight and brings the whole kit to site at once.

Do you prepare reclamation projects for oil-contaminated plots?

Yes. We prepare the reclamation project under Order No. 289 of the Ministry of Agriculture and provide survey support for the technical stage: baseline survey, volume calculation and a control survey after restoration.

How does a high water table affect the surveys?

A high water table changes the drilling and sampling method, and part of the field testing is scheduled for the dry season. We record the water level in every borehole, since it affects foundation calculations and the choice of foundation type.

Need a project estimate?

Send the brief or call us and we will return a preliminary site estimate within 24 hours.

CallWhatsAppEstimate